1

About PIK 2

News Discuss 
PIK2 started design in 2016 determined by TOWNLAND’s renewed Master Program on this Beforehand swampy and low yielding agricultural land. This was followed by construction of the leading ring highway network as the first spine with the Township’s circulation method and subsequently the canal process. So far (mid-2021), PIK 2 https://www.propanraya.com/propan-sandimas-experience-center-hadir-di-pik-2-tawarkan-inovasi-terbaik-untuk-solusi-cat-dan-pelapis

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story