At this stage, the roof can be installed — or at the very least loaded— previous to setting up the doorways and windows. This allows the building envelope to settle. Footings are commonly broader than the foundation and sit just one foot beneath the frost line (The everyday depth at https://preecha-concrete-pile03681.blogkoo.com/5-easy-facts-about-pile-described-52055066