The first park provides a capability of two hundred MW even though Sandrini II contains a capability of 100 MW. The full expense of the two assignments weren't disclosed having said that, for the duration of building, in excess of two hundred staff ended up utilized. The assignments are envisioned https://californiasolarcompany.video.blog/2024/11/26/how-to-start-solar-energy-system-installation-with-a-california-solar-company/